This project will widen US13 from two travel lanes in each direction to three travel lanes in each direction. This project is designed to accommodate all users. Project includes a shared-use path along both sides of the roadway from Lochmeath Way to Webbs Lane and all signals will be upgraded to included crosswalks and pedestrian signals. Bus stops are included to accommodate transit users within the project limits. This is the first of two projects planned for US13.